Logo

31 日 マニラ

31°C26°C
両替レート
¥10,000=P3,830
$100=P5,715

31 日 マニラ

31°C26°C
両替レート
¥10,000=P3,830
$100=P5,715

Daily PNR trips from Alabang to Calamba temporarily suspended starting July 2

2023/6/3 英字

In a bid to give way for the construction of the North-South Commuter Railway (NSCR), daily trips of the Philippine National Railways’ (PNR) Alabang to Calamba route will be temporarily suspended starting Friday, June 2.

Only two trips will be affected by the route’s closure?the 4:38 am trip and 7:56 pm trip. About 467 commuters take each trip daily.

According to Transportation Undersecretary for Railways Cesar Chavez, an elevated, double-track and electrified train system will be built directly above the existing PNR tracks, speeding up the construction of the NSCR by eight months.

The new NSCR system will replace the PNR’s present street level, single track and diesel locomotive set-up.

While the NSCR is being constructed along the route, the following PNR stations will be temporarily unavailable: Alabang, Muntinlupa, San Pedro, Binan, Sta. Rosa, Cabuyao, Mamatid, and Calamba.

Once completed, the 147-km NSCR will cut travel time from Clark Airport in Pampanga to Calamba in Laguna to less than two hours, from 4-4.5 hours. It is set to accommodate 800,000 passengers a day. During its construction, approximately 110,000 direct and indirect jobs are expected to be generated. DOTr

おすすめ記事

Two to four stations of Metro Manila Subway complete by 2028: Dizon

2025/7/31 英字 無料
無料

AFP strengthens military partnership in courtesy call with JSDF leadership

2025/7/31 英字 無料
無料

English Articles

2025/7/31 英字 無料
無料

Man accused of fooling establishments in Metro Manila arrested in Quezon City

2025/7/31 英字 無料
無料

Marcos orders all Dalian trains deployed for MRT-3

2025/7/31 英字 無料
無料

Recovery of Japanese war dead ''continuous'': Remulla

2025/7/30 英字 無料
無料